At this moment, nothing much I could do. The installation is all in mess! The piping is loosening within one hundred more deep inside the earth because the water comes out too fast and some other reasons of workmen troublesome. The worst thing is that the turbine could not resist the flow of very high pressure water. This is all disaster of a project I have this time.

This Project might take photoSitting around in a café table, I talk to my supervisor about my consideration to install water booster stations in some points within the land construction range. I should change my mind when learning that the water for what we have been digging for week has a very large source under the ground. And as the alternative, we are planning to go on the project without the stations and install more important devices.

Because the water has flown upward rapidly since this morning and has ruined the installation, this project might take some new equipments and devices in good quality and condition; the housing project I am handling now takes more than two hundreds miles square. Some medium-sized turbine pitless units with big power are needed here. The pumped water will be straightly separated to some tanks in every twenty five meters, or approximately around two to three houses. And the water must be enough to supply them.

Within the area of the houses, we will install weld on adapters to support the distribution of water to each house nearby. It apparently will turn to be better separation then using direct piping to each house. Yet, it still does not prove anything until we install them. There could probably be a realization of this idea, or there perhaps could be another trouble happened.

Anyway, just give it a try.
A sirene cries in the distance telling us that the break time is over. Alright, the decision is already made, and here we go continue the project.